SANFU SHIPBUILDING one 3500TEU Dual-Fuel Container Vessel Keel Laying
Release time:2025-06-04 Number of views:

On the morning of 3rd June 2025, the 6th 3500TEU dual-fuel (LNG+MGO) container ship (Hull No. SF210306) built by Sanfu shipyard for German ship owner held the on-stage closing ceremony at 4# shipyard, representatives of ship owner, DNV classification society and Sanfu shipyard witnessed this important moment together.

 

This series of 3500TEU dual-fuel container ship is designed by HB HUNTE design company from Germany and adopts bow type design. The ship has an overall length of 248.00 metres, a plumbline length of 236.50 metres, a beam of 35.20 metres, a depth of 19.2 metres, a design draught of 11.00 metres, a maximum deadweight tonnage of 51,000 metric tons, a design speed of 19.5 knots, and it has entered the DNV classification society.

1300-02.jpg 


Copyright © 2021 - Taizhou Sanfu Heavy Industry Group Co., Ltd   备案号:苏ICP备11000697号-2 腾云建站仅向商家提供技术服务 Website Map